East Court can gain a clearer arrival sequence.
Lobby renewal | Concept review and reception-location decision
The current reception position interrupts the route from entry to lift.
Working assumption for this fictional study: the existing desk occupies the central approach. Confirm against a measured plan before design approval.
A relocated desk can keep the primary route open.
Editable plan diagram: proposed entrance, reception, waiting, and lift relationships. Concept study only; not measured and not approved.
Relocating reception offers a clearer route with greater services risk.
Retain the desk
- Lower assumed services disruption
- Central approach remains constrained
- Smaller change to operating procedures
Move the desk
- Direct entry-to-lift route
- Waiting area gains a defined edge
- Services relocation needs survey confirmation
The concept is framed by three planning assumptions.
The planning budget is weighted toward fit-out and building services.
A staged build could preserve access throughout the 14-week window.
Survey, isolate works, and set up a temporary reception point.
Complete services changes and form the new reception zone.
Install finishes and complete the primary circulation route.
Test, correct defects, and hand over in stages.
Three checks must precede approval of the relocated desk.
Measure
Confirm entrance clearances and the desk location on a surveyed plan.
Trace services
Locate power, data, and ventilation connections before pricing.
Test operations
Review queuing, accessibility, and temporary reception with staff.
Approve the relocated-desk concept for measured development.
- Authorize a measured survey and services investigation.
- Confirm the preferred circulation and reception arrangement.
- Return with a costed scheme and validated phasing plan.