01Architectural Project Deck

East Court can gain a clearer arrival sequence.

Lobby renewal | Concept review and reception-location decision

East Court Project Team | Fictional study | 12 June 2026
Architectural Project Deck01 / 09
02Architectural Project Deck

The current reception position interrupts the route from entry to lift.

Working assumption for this fictional study: the existing desk occupies the central approach. Confirm against a measured plan before design approval.

Architectural Project Deck02 / 09
03Architectural Project Deck

A relocated desk can keep the primary route open.

Editable plan diagram: proposed entrance, reception, waiting, and lift relationships. Concept study only; not measured and not approved.

Architectural Project Deck03 / 09
04Architectural Project Deck

Relocating reception offers a clearer route with greater services risk.

Retain the desk

  • Lower assumed services disruption
  • Central approach remains constrained
  • Smaller change to operating procedures

Move the desk

  • Direct entry-to-lift route
  • Waiting area gains a defined edge
  • Services relocation needs survey confirmation
Architectural Project Deck04 / 09
05Architectural Project Deck

The concept is framed by three planning assumptions.

1,800 m²
Indicative interior scope; verify measured area
$2.4m
Planning budget; not a priced tender
14 weeks
Assumed construction window; subject to phasing review
Architectural Project Deck · Sample figures, replace with sourced data05 / 09
06Architectural Project Deck

The planning budget is weighted toward fit-out and building services.

% of $2.4m
38Fit-out24Services18Finishes12Fees8Allowance
TakeawayIndicative allocation totals 100%; validate scope and services exposure before setting a cost plan.
Architectural Project Deck · Sample figures, replace with sourced data06 / 09
07Architectural Project Deck

A staged build could preserve access throughout the 14-week window.

Weeks 1-3

Survey, isolate works, and set up a temporary reception point.

Weeks 4-7

Complete services changes and form the new reception zone.

Weeks 8-11

Install finishes and complete the primary circulation route.

Weeks 12-14

Test, correct defects, and hand over in stages.

Architectural Project Deck07 / 09
08Architectural Project Deck

Three checks must precede approval of the relocated desk.

Measure

Confirm entrance clearances and the desk location on a surveyed plan.

Trace services

Locate power, data, and ventilation connections before pricing.

Test operations

Review queuing, accessibility, and temporary reception with staff.

Architectural Project Deck08 / 09
09Architectural Project Deck

Approve the relocated-desk concept for measured development.

  1. Authorize a measured survey and services investigation.
  2. Confirm the preferred circulation and reception arrangement.
  3. Return with a costed scheme and validated phasing plan.
Architectural Project Deck09 / 09